CP Chamber Parts

Live progress

Connecting…

Checking current work…

Stage

—

Page / section

—

Elapsed

—

Response characters

—

Generated tokens

Available when reported by Ollama

Job heartbeat

—

Updates every three seconds. Saved-page progress advances after a whole page commits. Character counts show output received for the current model request; they are not a completion percentage. During input processing Ollama may emit no output. No estimated finish time is guessed.

all · unkown

PILZ / P02

Open source PDF

Ask about this document Delete document

Status: indexed

29 of 29 pages analysed. 30 extracted records across all pages.

Completed page timings

PDF page 1 · direct-text · No AI: PDF text

PDF page 2 · direct-text · No AI: PDF text

PDF page 3 · direct-text · No AI: PDF text

PDF page 4 · direct-text · No AI: PDF text

PDF page 5 · direct-text · No AI: PDF text

PDF page 6 · direct-text · No AI: PDF text

PDF page 7 · direct-text · No AI: PDF text

PDF page 8 · direct-text · No AI: PDF text

PDF page 9 · direct-text · No AI: PDF text

PDF page 10 · direct-text · No AI: PDF text

PDF page 11 · direct-text · No AI: PDF text

PDF page 12 · direct-text · No AI: PDF text

PDF page 13 · direct-text · No AI: PDF text

PDF page 14 · direct-text · No AI: PDF text

PDF page 15 · direct-text · No AI: PDF text

PDF page 16 · direct-text · No AI: PDF text

PDF page 17 · direct-text · No AI: PDF text

PDF page 18 · direct-text · No AI: PDF text

PDF page 19 · direct-text · No AI: PDF text

PDF page 20 · direct-text · No AI: PDF text

PDF page 21 · direct-text · No AI: PDF text

PDF page 22 · direct-text · No AI: PDF text

PDF page 23 · direct-text · No AI: PDF text

PDF page 24 · direct-text · No AI: PDF text

PDF page 25 · direct-text · No AI: PDF text

PDF page 26 · direct-text · No AI: PDF text

PDF page 27 · direct-text · No AI: PDF text

PDF page 28 · direct-text · No AI: PDF text

PDF page 29 · direct-text · No AI: PDF text

Timings include page extraction, rendering where needed, and model requests. Earlier pages may have no timing.

PDF text index

This text was copied from the PDF without AI interpretation. Indexed does not mean reviewed or approved. Check reading order against the PDF. Pages listed above may need OCR or may be blank.

Search source text / ask

Compare each record with the PDF. Model certainty is an unverified judgement. Page numbers below are PDF page positions, not printed sheet numbers. Approval adds knowledge-base evidence; it does not overwrite the existing machine wire register.

SOURCE_TEXT PDF page 22, section 1

indexedSource page 22
0 1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Project:
Date: Function:
Drawing no.:
Location:
Init.: Rev.:
24
Sheet:
1
Total sheets: Next sheet:
22 02/02/2025
Associated British Ports ABP
ABP Southampton
Ocean Gate
Atlantic Way
Southampton SO14 3QN
19322SQ ABP Southampton
Sliding Door & Gate System
7
A1+
T1
IN1
T2
IN2
T3
IN3
T4
IN F/S
13
23
33
41
A2-
14
24
34
42
AUTOSTART / MONITORED START
LOGIC
SR9
SIEMENS
A1+
T1
IN1
T2
IN2
T3
IN3
T4
IN F/S
13
23
33
41
A2-
14
24
34
42
AUTOSTART / MONITORED START
LOGIC
SR10
SIEMENS
24v 1T1 23.9 24v 1T1
0v1T1 23.9 0v1T1
85
85
Safety Relays 9 & 10
84
84
144
Door C1 Sens SR9/i8 8.4
145
Door C2 Sens SR10/i24 9.6
149
149
148
148
148
148
148
148
148
148
Sens SAfety Link B - C 23.3 149
149 SR4 + 7.5
SK26
20.8
12 8
SK27
20.8
10 6
36 84
133 84

→ · · PDF text; not AI interpreted